- A 1000 square meter metal hall for plastic manufacturing was delivered after its complete construction and covering with metal sheets.
- Additionally, pre-fabricated halls totaling 2600 square meters were used as warehouses for a detergent factory. These consist of pre-fabricated concrete columns, beams, and purlins, enclosed by block walls and sandwich panel sheets.